Davis County · 25,660 residents

Farmington ADU rules

Farmington: internal ADUs allowed (lot 6,000+ sq ft); detached ADUs allowed (lot 10,000+ sq ft).

Internal ADU (inside the home)

Generally allowed

Detached ADU (backyard building)

Generally allowed

Not yet fully verified · last reviewed September 7, 2026 See sources

Farmington ADU rules at a glance

Farmington internal and detached accessory dwelling unit rules
RuleInternal ADU (basement, attic, inside the home)Detached ADU (backyard building)
Allowed?AllowedAllowed
Minimum lot6,000 sq ft. Statewide statute includes a small-lot pathway around 6,000 sq ft for many internal ADUs — confirm how Farmington applies it on your zone.10,000 sq ft. Local minimum often cited at 10,000 sq ft — Already allows DADUs on ≥10,000 sq ft (more permissive than 11,000). Confirm permitted-use status and parking caps for SB 284.
Owner occupancyOwner occupancy of primary or ADU; temp absentee ownership allowed for military/employment/family/quasi-public serviceSSF: separate ownership/utilities; 2-year owner-occupancy after separation; additional lot-size rules if IADU retained
Size limitsIADU prohibited if lot <6,000 sq ftDADU prohibited if lot <10,000 sq ft
HeightNot yet verified — confirm with the cityDADU footprint ≤ primary footprint; height subordinate to main building; accessory building standards of zone
ZonesNot yet verified — confirm with the cityDADU footprint ≤ primary footprint; height subordinate to main building; accessory building standards of zone
Permit processADU application + building permitDADU footprint ≤ primary footprint; height subordinate to main building; accessory building standards of zone

State law: detached ADUs from October 1, 2026

Farmington is a “specified municipality” under Utah S.B. 284. Beginning October 1, 2026, it must permit one detached ADU as a permitted use on a lot of 11,000 sq ft or more that has a detached single-family home. The city can still apply setbacks, height, design, owner-occupancy and limited parking rules, and it may allow detached ADUs on smaller lots. How the state ADU laws work.

How our property map screens Farmington lots

The map colors parcels using the rules on this page and the recorded lot size. A color is a planning screen, not a permit; Farmington makes the decision.

  • The statewide map screen starts a new external ADU at about 11,000 sq ft. Farmington's researched external minimum is 10,000 sq ft. Lots below that city minimum stay highly unlikely on the map even when they clear 11,000 sq ft.
  • "Likely" above 15,000 sq ft is this site's planning band for a large recorded lot. It is not a sentence in the Farmington code. Owner occupancy, parking, setbacks, zones, and HOA rules below still have to be checked.

Planned communities, PRDs and PUDs

Reviewed on September 22, 2026 against this city's research file, its published ADU page where one was found, and Utah meeting packets. No adopted sentence was confirmed that allows or bans an ADU in every PUD, PRD, PRUD, or planned community. If the assessor class or subdivision name says PUD, PRD, PRUD, planned unit development, planned residential development, planned community, resort community, or master planned community, the map keeps that lot highly unlikely regardless of size. A plat, CC&Rs, or development agreement can still prohibit an ADU where the zone allows one.

Open Farmington on the property map

Planning notes for Farmington

Farmington publishes an ADU/internal-ADU application, an internal-unit eligibility checklist and a toolkit covering ADUs and subordinate single-family dwellings. These labels describe different planning routes. Have your proposed backyard or internal design classified before assuming one application or set of setbacks covers every option.

Bring these to your review

  • Internal-ADU eligibility checklist where applicable
  • Concept footprint and relationship to the main home
  • Parcel zone, overlay and ownership information

The question to resolve first

Is this proposal an internal ADU, detached ADU or subordinate single-family dwelling under current Farmington rules?

Sources

We link only to government sources and public meeting records. Codes change; confirm the current version with Farmington before you apply.

Common Farmington ADU questions

Can you build an ADU in Farmington?

Farmington: internal ADUs allowed (lot 6,000+ sq ft); detached ADUs allowed (lot 10,000+ sq ft). This is planning guidance, not a permit. Confirm the zone on your parcel with Farmington.

What lot size does Farmington require for an ADU?

Internal ADU: 6,000 sq ft minimum. Statewide statute includes a small-lot pathway around 6,000 sq ft for many internal ADUs — confirm how Farmington applies it on your zone. Detached ADU: 10,000 sq ft minimum. Local minimum often cited at 10,000 sq ft — Already allows DADUs on ≥10,000 sq ft (more permissive than 11,000). Confirm permitted-use status and parking caps for SB 284.

Does Farmington require the owner to live on the property?

Internal ADU: Owner occupancy of primary or ADU; temp absentee ownership allowed for military/employment/family/quasi-public service. Detached ADU: SSF: separate ownership/utilities; 2-year owner-occupancy after separation; additional lot-size rules if IADU retained.

What does it cost to build an ADU in Farmington?

Wasatch Front planning bands are often about $55,000–$145,000 for an internal suite, $70,000–$175,000 for a garage conversion, and $95,000–$250,000 or more for a new detached unit, before unusual site work. These are planning ranges, not bids.

Can an HOA block an ADU in Farmington?

City approval does not override CC&Rs or plat notes. Read the HOA documents and your subdivision plat before you design. A private restriction can stop a unit the city would otherwise allow.

Before you design: general checks for any Utah ADU

General planning advice, not Farmington code.

  • Confirm the zoning district on the city zoning map. The county assessor’s “residential” class is not zoning.
  • Read your HOA CC&Rs and subdivision plat notes; private restrictions can block a unit the city allows.
  • Sketch existing and proposed parking. Driveway geometry and access often decide what fits.
  • Ask early about sewer, water and electrical capacity; utilities can force a redesign.
  • Expanding a building’s footprint usually triggers full setback and height rules.

Nearby city ADU rules

Want to know what fits on your Farmington lot?

Free, no obligation. We review your parcel against these rules and, if you want, introduce independent design and construction partners. Partners may pay us for referrals.

Utah ADU Builder provides educational planning guidance. This page is not legal advice and not a permit. Population: UGRC POPLASTESTIMATE / Census-derived municipal estimates (manual fill where UGRC blank). Editorial standards.