Prefab or site-built ADU?

Compare the installed, permitted project rather than the factory price against a contractor’s complete bid.

Compare equal scope

  • For prefab, ask whether the quote includes foundation, delivery, crane placement, utility hookups, permits and final inspections.
  • For site-built, identify site access, material storage, weather exposure and trade scheduling.
  • Confirm which design changes are possible, their lead times and their effect on price.

Check delivery before ordering

  • Measure street access, turning space, overhead lines and the route to the foundation.
  • Ask the supplier and installer to verify crane setup and delivery permissions.
  • Confirm storage costs and responsibility if the site or foundation is not ready on the delivery date.

Confirm approvals and handoff

  • Ask the city which approvals apply to the specific construction system and site.
  • Identify who resolves damage or defects at the factory/installer boundary.
  • Get one written list of exclusions and an accountable contact for the finished project.

Turn the checklist into a project plan

Record each open question, the person responsible, evidence needed and target date. Confirm requirements with the city and your licensed design/build professionals.